Case Study
Kraft Heinz
Large-Scale 24/7 Food Manufacturing Mobilisation & Transformation
Estate Overview
- Partner since October 2021
- 24/7 live production facility
- 55-acre estate, one of Europe’s largest food production plants
- 100+ employees transferred under TUPE during mobilisation
- Integrated services: plant cleaning, hygiene, security, catering, landscaping
This is a safety-critical food manufacturing environment where service disruption or hygiene failure directly impacts production, compliance and brand reputation.
The Procurement Challenge
The contract required simultaneous delivery across three high-risk dimensions:
1. Complex TUPE Mobilisation
Transfer of 106 employees from the incumbent provider within a live 24/7 manufacturing site, while maintaining food safety standards and uninterrupted production.
2. Industrial & Operational Risk
Heavy machinery, chemical processes and strict food hygiene controls meant that non-compliance could result in production shutdown, safety incidents or reputational damage.
3. Efficiency & Sustainability Expectations
Kraft Heinz required operational improvements, cost efficiencies and measurable environmental gains without compromising hygiene or safety.
The Delivery Model
Samsic deployed a cross-functional mobilisation team incorporating operations, HR, health & safety, training and finance to manage the transition with structured governance.
Key actions included:
- Formal mobilisation plan with defined milestones and risk controls
- Weekly stakeholder governance meetings
- Individual TUPE consultations for all transferring employees
- Immediate quality framework integration (“The Samsic Way”)
- ECAT performance auditing with senior-level reporting
Operational improvements were implemented post-mobilisation:
- Shift pattern optimisation aligned to production cycles
- Redesigned 40-hour weekend shutdown deep cleans
- Dedicated Key Account Manager oversight
Measurable ESG & Efficiency Impact
Environmental and operational improvements were embedded into core delivery:
These initiatives reduced resource consumption while maintaining or improving hygiene standards and ATP testing results.
Outcome
- Seamless TUPE transition with no disruption to 24/7 production
- Improved hygiene performance across shutdown cycles
- Measurable reductions in chemical and water use
- Enhanced workforce stability and engagement
- Improved operational efficiency across a multi-service estate
Why This Matters for Constellia Buyers
For public sector and healthcare procurement teams, this case demonstrates:
This case demonstrates:
Proven large-scale mobilisation capability
- Proven large-scale mobilisation capability
- Delivery in hazardous, regulated environments
- Integrated FM governance across multiple service lines
- Practical ESG integration with measurable operational outcomes
- Structured risk management in a live industrial setting
